题干

2011年6月30日,全国人大常委会通过的行政强制法规定:行政机关不得在夜间或者法定节假日实施行政强制执行,情况紧急的除外。不得对居民采取断水、断电、断气等方式强制执行,公民受到行政强制权侵害时可获救济。这说明提高政府依法行政水平,要做到(  )
①加强司法机关队伍建设    ②提高公民素质
③严格执法,文明执法      ④坚持以人为本,对人民负责

A:①②

B:①③

C:②④

D:③④

上一题 下一题 0.0难度 选择题 更新时间:2019-01-09 09:44:19

答案(点此获取答案解析)

D

同类题5

阅读理解

    In its early history, Chicago had floods frequently, especially in the spring, making the streets so muddy that people, horses, and carts got stuck. An old joke that was popular at the time went something like this: A man is stuck up to his waist in a muddy Chicago street. Asked if he needs help, he replies,“No, thanks. I've got a good horse under me.”

    The city planners decided to build an underground drainage(排水) system, but there simply wasn't enough difference between the height of the ground level and the water level. The only two options were to lower the Chicago River or raise the city.

    An engineer named Ellis Chesbrough convinced the city that it had no choice but to build the pipes above ground and then cover them with dirt. This raised the level of the city's streets by as much as 12 feet.

    This of course created a new problem: dirt practically buried the first floors of every building in Chicago. Building owners were faced with a choice: either change the first floors of their buildings into basements, and the second stories into main floors, or hoist the entire bulidings to meet the new street level. Small wood-frame buildings could be lifted fairly easily. But what about large, heavy structures like the Tremont Hotel, which was a six-story brick building?

    That's where George Pullman came in. He had developed some house-moving skills successfully. To lift a big structure like Tremont Hotel, Pullman would place thousands of jackscrews(螺旋千斤顶) beneath the building's foundation. One man was assigned to operate each section of roughly 10 jackscrews. At Pullman's signal each man turned his jackscrew the same amount at the same time, thereby raising the building slowly and evenly. Astonishingly, the Tremont Hotel stayed open during the entire operation, and many of its guests didn't even notice anything was happening.

    Some people like to say that every problem has a solution. But in Chicago's early history, every engineering solution seemed to create a new problem. Now that Chicago's waste water was draining efficiently into the Chicago River, the city's next step was to clean the polluted river.