题干

Because of the continuous bad weather, the building work of the bridge over the Yangtze River is far behind
A.regulationB.procedureC.scheduleD.campaign
上一题 下一题 0.85难度 单项选择 更新时间:2013-05-08 01:23:45

答案(点此获取答案解析)