题干

The new stadium under construction for the next Asian Games   the present one is due to be completed in two months.
A. measured three times as big as     B. measuring three times as big as
C. measured as big as three times     D. measuring as three times big as
上一题 下一题 0.4难度 单项选择 更新时间:2019-03-01 08:28:56

答案(点此获取答案解析)